Just spent 10 days in Paris, terrific city, that keep on polishing and have gotten a pretty impressive culture. Talk about history. All the buildings are 300 years old and fully functional. I was impressed with everything. The trip got me thinking about how to do the Mission Planning /...
Another month goes by, no post but plenty of progress. 1. External Wiring of the base is 100% complete 2. Internal wiring for battery is 100% complete 3. Power distribution / fuse board 60% complete. 4. Jeremy Lucas has agreed to join in a ROS-applied project. 5. Organizing photos to...
It has been three weeks and no posts. Sorry, but I have been busy. Working on the power supply, fuse board and regulators. Got most of it wired up, Order capacitors and received them. Then got to thinking if everything is 5.0 volt. why not get a DC/DC convertor. So...
I was able to put in about 8 hours this weekend. Last weekend was only about 2 hours mostly brain time. I Finally have the power connected with the diodes and cabled up. Now working on the switchboard / relay system for all power. Want to cram, main bus fuses,...
It is Monday morning and very little got done on Ripley in the last seven days. I have lots of parts and a Frequency generator. I also located some missing technology that I had safety put in a forgotten storage bin. But like everything in life I need more parts...